Our journey began in 2013 around piping systems and welded fabrication. Today, we connect this experience with engineering, machining and marine outfitting.
We began production at our Gebze Balçık address in 2021. In 2025, our updated capacity report documented our equipment and theoretical annual output. Today, we operate across a 15,000 m² site with 9,000 m² of production space.
- 2013 — Establishment
- 2021 — Gebze Balçık production address
- 2025 — Capacity report
- Today — 9,000 m² production space
